| P R O D U C T S - S U N D R Y V I B R A T E D P R O D U C T S | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Covers and Slabs for Manholes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Description | Specification | Custom-made Products | Accessories | Areas of Use | Handling & Installation |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Description
Reducer slabs In deep manhole chambers, the diameter of the chamber can be reduced in order to make it more cost effective. The Reducer Slabs are placed onto the larger section in order to reduce the diameter and so doing, creates a "tunnel" for the access to the operating chamber. The following table shows detail on the reducer slabs available:
|
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Cover Slabs In order to seal the manhole chamber, a cover slab is necessary. These cover slabs can be used to close the range of manhole sections. The concrete lid is profiled to fit directly into the cover slab and be flush with the top. The following table shows detail on the Cover Slabs available:
Concrete lid A Concrete Lid is also offered as an alternative to the conventional cast iron lid. High theft rates have left a large number of manholes exposed, resulting in a health and safety risk. The heavy nature combined with the zero resale value of the concrete lid makes this an effective solution. The profile of the lid is designed to fit directly into the Cover Slab, or onto the Adaptor Slab. The following table shows detail on the Concrete Lids available:
Spacer Slabs On occasion it becomes necessary to adjust the level of the access opening to the manhole without using extra manhole sections. In instances like these, spacer slabs are used and placed over the lid opening. These spacer slabs are not profiled to the Concrete Lid, so the Adaptor Slab must be combined with it to facilitate the placement of the Lid. The following tables show detail on the Spacer Slabs and the Adaptor Slabs.
For more information on these and other products, please use the contact us facility.
Specification Although the range detailed above is designed to suit almost all the possible applications, special products can be designed and manufactured to suit "Special" needs, such as excessive loadings, openings and breather holes, etc. Please use the contact us facility for more information on this product. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Accessories
These products are regarded as accessories for the range of
Manholes
that Rocla
|
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Areas of Use These products are utilized in the wholistic manhole installation, and can be found in both Stormwater and Sewer applications. They are ideal in applications where maintenance-free, high quality solutions are required. |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Handling and Installation When handling any concrete products, it is important to remember that, as concrete is a heavy and somewhat brittle material, bumps or shock loads of any description are liable to damage the product. This applies particularly to sharp edges. Manhole components will usually be transported in an upright position, and should be off-loaded and stacked in this position. Manhole sections should never be lifted by the step irons. The correct manhole lifting equipment should be used for these operations. During the installation, the trench or excavation must be prepared to the Site Engineers specification. The excavation for the manhole should be 300mm wider than the outside of the manhole, or as specified by the engineer. The excavation must allow for the extra depth required for the base. Cast in situ bases are widely used, but must include for the appropriate benching situation. The base should extend approximately 150mm below the lower level of the waterway, and 300mm wider than the outer dimensions of the Manhole section. A starter ring must be positioned and leveled on this base. Precast bases can be used installed as part of the pipe-laying program. Care must be taken to level this base on a compacted area. If required the soil below the base must be stabilized with cement and then compacted. The following manhole units then fit directly onto this bas, and no starter rings are required. The joints between the manhole sections must be sealed with a cement mortar or rubber/bitumen sealer. This must be specified by the engineer on site. In deep manhole chambers, the diameter of the chamber can be reduced in order to make it more cost effective. The Reducer Slabs are placed onto the larger section in order to reduce the diameter and so doing, creates a "tunnel" for the access to the operating chamber. This is normally specified by the engineer. In order to seal the manhole chamber, a cover slab is necessary. These cover slabs can be used to close the range of manhole sections. The concrete lid is profiled to fit directly into the cover slab and be flush with the top. On occasion it becomes necessary to adjust the level of the access opening to the manhole without using extra manhole sections. In instances like these, spacer slabs are used and placed over the lid opening. These spacer slabs are not profiled to the Concrete Lid, so the Adaptor Slab must be combined with it to facilitate the placement of the Lid. A Concrete Lid is also offered as an alternative to the conventional cast iron lid. High theft rates have left a large number of manholes exposed, resulting in a health and safety risk. The heavy nature combined with the zero resale value of the concrete lid makes this an effective solution. The profile of the lid is designed to fit directly into the Cover Slab, or onto the Adaptor Slab. Each lid has a lifting hook cast into the product, so installation can be done through this. For more information on manhole installation, please use the contact us facility, as our staff can be of assistance on site with the installation activities . |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
